M1 (A1(M) J43) Hook Moor Interchange

Layout and signage

The NORTH
Wetherby
A1(M) Link
     

A1(M)
  The SOUTH
Hull (M62 Link)
A1(M) Link

Lane configuration

LanesLanesLanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 is gained from the entry sliproad.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.
  • Lane 5 continues ahead.

LanesLanesLanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 exits and does not return.
  • Lane 3 exits and does not return.
  • Lane 4 continues ahead.
  • Lane 5 continues ahead.
  • Lane 6 continues ahead.

In this section

What's new

Silver bullet

The Silvertown Tunnel is finally open for business. One question remains: what’s it for?

Skid Risk, Accident, Fog

For the first time, we can share pictures of the pioneering experiment that lit up the Worcestershire countryside with enormous signs 61 years ago.

All change

In July 2024, a new Government entered office with a very different set of priorities. What does it mean for a faltering roads programme?

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated