M25 J27 Theydon Interchange

Layout and signage

London (NE)
Stansted Airport
Harlow
Cambridge
M11 Link
  M11     M11   London (NE)
Stansted Airport
Harlow
Cambridge
M11 Link

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and returns after the junction.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and returns after the junction.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

Other events

  • Signs Variable Speed Limits apply
  • Signs Variable Speed Limits apply

In this section

What's new

Silver bullet

The Silvertown Tunnel is finally open for business. One question remains: what’s it for?

Skid Risk, Accident, Fog

For the first time, we can share pictures of the pioneering experiment that lit up the Worcestershire countryside with enormous signs 61 years ago.

All change

In July 2024, a new Government entered office with a very different set of priorities. What does it mean for a faltering roads programme?

Share this page

Have you seen...

Pedestrian Crossings

From Zebra to Pelican and beyond: the comprehensive history of the development of the humble pedestrian crossing.

About this page

Published

Last updated