M60 J12 Eccles Interchange

Layout and signage

Warrington
Liverpool
M62 Link
Birmingham (M6 Link)
Manchester (Cen)
Salford
M602 Link
  M602



    M62



  Warrington
Liverpool
M62 Link
Manchester (Cen)
Salford
M602 Link

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 exits and does not return.
  • Lane 3 continues, with option to exit.
  • Lane 4 continues ahead.

LanesLanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

In this section

What's new

Farewell GLC lights

Why am I all nostalgic about some street lights being replaced?

Silver bullet

The Silvertown Tunnel is finally open for business. One question remains: what’s it for?

Skid Risk, Accident, Fog

For the first time, we can share pictures of the pioneering experiment that lit up the Worcestershire countryside with enormous signs 61 years ago.

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated