A167(M) Pilgrim Street Interchange

Layout and signage

N/A   A186





    A186



  The SOUTH
Gateshead (A1(M) Link)
A167
Walker
City Centre (S)
A186

Lane configuration

LanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues, with option to exit.
  • Lane 3 continues ahead.

LanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.

Other events

  • Signs End of motorway regulations
  • Signs 50mph speed limit begins
  • Signs Start of motorway regulations
  • Signs 30mph speed limit begins

In this section

What's new

Farewell GLC lights

Why am I all nostalgic about some street lights being replaced?

Silver bullet

The Silvertown Tunnel is finally open for business. One question remains: what’s it for?

Skid Risk, Accident, Fog

For the first time, we can share pictures of the pioneering experiment that lit up the Worcestershire countryside with enormous signs 61 years ago.

Share this page

Have you seen...

M1 under construction

Pictures taken as the first section of the M1 was being built in 1958-9, with all its unique architecture still under construction.

About this page

Published

Last updated