M1 J6A Chiswell Interchange

Layout and signage

  M25
(M3)
(M4)
(M40)
    M25
(M11)
(M20)
  Stansted Airport (M11 Link)
Dartford (M20 Link)
Heathrow Airport
(M40 Link, M4 Link, M3 Link)
M25 Link

Lane configuration

LanesLanesLanesLanesLanesLanes

  • Lane 1 is gained from the entry sliproad.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

LanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return.
  • Lane 2 continues ahead.
  • Lane 3 continues ahead.
  • Lane 4 continues ahead.

Other events

  • Signs Variable Speed Limits apply
  • Signs National Speed Limit begins

In this section

What's new

Silver bullet

The Silvertown Tunnel is finally open for business. One question remains: what’s it for?

Skid Risk, Accident, Fog

For the first time, we can share pictures of the pioneering experiment that lit up the Worcestershire countryside with enormous signs 61 years ago.

All change

In July 2024, a new Government entered office with a very different set of priorities. What does it mean for a faltering roads programme?

Share this page

Have you seen...

M1-A1 Link Road

Those last few miles of the M1 east of Leeds were completed in 1999. It looks for the most part like a fairly average piece of road, but one of the project's engineers describes some of the challenges that were faced.

About this page

Published

Last updated