M42 J3A Umberslade Interchange

Layout and signage

London
Warwick
Stratford
M40 Link
      M40



  London
Warwick
Stratford
M40 Link

Lane configuration

LanesLanesLanesLanesLanesLanes
LanesLanesLanesLanesLanes

  • Lane 1 continues ahead.
  • Lane 2 continues, with option to exit.
  • Lane 3 exits and does not return.
  • Then further along:
  • Lane 1 continues ahead (part time using the hard shoulder).
  • Lane 2 continues ahead.
  • Lane 3 is gained from the entry sliproad.
  • Lane 4 is gained from the entry sliproad.

LanesLanesLanesLanesLanesLanesLanesLanes

  • Lane 1 exits and does not return (part time using the hard shoulder).
  • Lane 2 exits and does not return.
  • Lane 3 continues ahead.
  • Lane 4 terminates.
  • Lane 5 is gained from the entry sliproad.
  • Lane 6 is gained from the entry sliproad.

Other events

  • Signs Variable Speed Limits apply
  • Signs National Speed Limit begins

In this section

What's new

Farewell GLC lights

Why am I all nostalgic about some street lights being replaced?

Silver bullet

The Silvertown Tunnel is finally open for business. One question remains: what’s it for?

Skid Risk, Accident, Fog

For the first time, we can share pictures of the pioneering experiment that lit up the Worcestershire countryside with enormous signs 61 years ago.

Share this page

Have you seen...

Hogarth Flyover

It makes the traffic situation in one part of West London much more bearable but it should have been removed more than quarter of a century ago. It's amazing what you can do with a big Meccano kit.

About this page

Published

Last updated