It might be the most obviously unfinished motorway in the whole UK, let alone in London. The M23 was supposed to link London with Crawley - but its urban section was a problem that couldn't be solved.
The tale of how British traffic signing developed between the Second World War and the mid-1960s, bringing us from a system designed at the turn of the century to the signs we still use today.